Chennai
+919047724727

'impact project delays'

Items tagged with 'impact project delays'

product image
Alloy Steel

EN24 Alloy Steel is a high-strength steel alloy. This Alloy Steel EN24 grade contains nickel, chromium, and molybdenum and has a high tensile strength, good ductility, and wear resistance. With reasonably good impact qualities at low temperatures, this material is also suited for a wide range of high-temperature applications. The grade is a nickel-chromium-molybdenum alloy, which provides high tensile steel strength as well as good ductility and wear resistance. It is useful for a wide range of elevated temperature applications due to its comparatively good impact qualities at low temperatures. We are the primary Alloy Steel EN24 dealers for industry leaders. Contact us if you want to acquire the best steel materials at the greatest price. Stock Availability of Alloy Steel EN24: This Alloy Steel Material is available in EN24 Rounds. More than 150mm dia rods can be availed in forged forms also. En24 round rods are supplied as per our Customer’s Cutting Requirement. Applications of Alloy Steel EN24: Alloy Steel EN24 most commonly used as High Strength Shafts used in Aircrafts, heavy vehicle crank shafts, Connecting rods, Gear shafts, Chain parts, Clutches, Propeller shafts, Cam shafts, Spindles, Screws, Studs, Pinions, Taps, Boring bars etc. It is also seen as Punch, Die, Drill bush, Retaining rings and Gears. Preferred to be applied for heat treated components having large sections.

Send Message
product image
Alloy Steel

Alloy Steel EN31 is an extremely strong steel alloy that is hardened and tempered before being supplied. Its nickel, chromium, and molybdenum content results in a high tensile steel with good ductility and wear resistance. EN31 round bars have a high internal strength and a high exterior strength, making them extremely wear-resistant. Alloy Steel EN31 is ideal for a wide range of elevated temperature applications due to its comparatively good impact qualities at low temperatures. Alloy Steel EN31 round bars provide an excellent balance of ductility, strength, and wear resistance. EN31 Alloy Steel is a high-strength alloy engineering steel. Stock Availability of Alloy Steel EN31: This Alloy Steel Material is available in EN31 Rounds,EN31 Flats,En31 Square. These materials are supplied as per our Customer’s Cutting Requirement. Applications of Alloy Steel EN31: Applications for EN31 steel include taps, gauges, swaging dies, ejector pins, ball, and roller bearings. It is good quality steel for wear-resisting machine parts and for press tools that do not merit a more complex quality.

Send Message
product image
Alloy Steel

Alloy Steel EN353 is a very high strength steel alloy that is hardened and tempered before delivery and contains nickel, chromium, and molybdenum, giving it excellent tensile steel strength, ductility, and wear resistance. With relatively good impact characteristics at low temperatures. This metal is also ideal for a range of high-temperature applications. Round bars have a high internal strength and a high external strength, making them highly wear resistant. Alloy Steel EN353 round bars have a good combination of ductility, strength, and wear resistance. Grade 353 is an extremely high strength alloy steel. We are the primary Alloy Steel EN353 dealers for industry leaders. Contact us to purchase the best steel materials at the cheapest price. Stock Availability of Alloy Steel EN353: This Alloy Steel is normally available in EN353 Round form. Larger Size EN353 rods are available only in forged form. We supply this Alloy steel En353 rods as per our Customer’s Cutting Requirement. Applications of Alloy Steel EN353: Alloy steel En353 is most commonly used in many automobile applications such as heavy duty gear, shaft, pinion, camshaft, gudgeon pins and Machining components.

Send Message
product image
Alloy Steel

Alloy Steel EN41B is a nitriding steel made of chromium, aluminum, and molybdenum. This case-hardening steel has strong wear resistance, as well as toughness and ductility. This alloy steel can achieve case hardnesses of up to 68 Hrc. It is also known as nitrating steel. It is toughened to a specific depth depending on the application in nitrating treatment to improve wear resistance and impact load on material. Stock Availability of Alloy Steel EN41B: Alloy Steel EN41B materials are available only in Round form. EN41B Rods are available in annealed condition and it can be machined. We supply this EN41B Steel Rods as per our Customer’s Cutting Requirement. Applications of Alloy Steel EN41B: Alloy Steel EN41B is a very popular grade of low carbon-manganese free-cutting steel, which is most suitable for the manufacture of repetition turned components such as nuts, bolts, hydraulic fittings and studs. This Alloy Steel is used particularly where intricate drilling and machining operations are involved.

Send Message
product image
Alloy Steel

The Ni-Cr-Mo alloy steel EN36 (Engineering Steel 36) is a hardening engineering steel. EN36 metal is designed specifically for carburising. This steel is commonly utilized due to its high core strength and exceptional toughness. Because of its high surface strength and soft and strong core, alloy steel EN36 is widely used in the vehicle sector. Alloy Steel EN36 is widely used in all industries to produce high-strength products. We provide alloy metal in round form at the most competitive price. Characteristics of EN36: Fatigue resistance High core strength Out stanning toughness High Surface strength Stock Availability of Alloy Steel EN36 Alloy Steel EN36 materials are normally available in Round form. Above 200mm EN36 rods are available only in forged form and can be supplied against order. We supply En36 steel rods as per our Customer’s Cutting Requirement. Applications of Alloy Steel EN36: Alloy Steel EN36 is used extensively by all industry sectors for components and shafts requiring high surface wear resistance, high core strength and impact properties. Typical uses are: Heavy Duty Bushings, Collets, Conveyor Pins, Heavy Duty Gears, King Pins, Ring Gears, Sprockets, Shafts etc..

Send Message
product image
Plastic and Laminates

Cast Nylon is a very adaptable thermoplastic resin. Cast nylon is an engineering material that is highly resistant to impact, wear, and vibration. It can considerably contribute to weight and noise reduction, lubricant savings, and gear life extension. Its physical qualities and low cost make it a better choice in many mechanical applications than metal and rubber. Cast Nylon offers excellent mechanical, thermal, and chemical resistance. It also has a high dimensional stability and is relatively free of internal tension. Stock Availability of Cast Nylon: Cast Nylon are of Nylon 66, MC 901 Grade, Metallon grade. These grades are available in Blue and Yellow colors and forms of Cast Nylon Round, Cast Nylon Sheet and Cast Nylon Plate. We supply these materials as per our customer’s cutting requirement. Applications of Cast Nylon: Cast Nylons are widely used in Bearings, Bushes, Clamps, Rollers, Door latches, Heavy duty wheels and Gears.

Send Message
product image
Plastic and Laminates

Polypropylene is a thermoplastic (plastic). Polypropene is another name for it. Because of its chemical resistance and weldability, polypropene plastic is employed in a variety of applications. Polypropylene is commonly used in consumer goods packaging (bottles, carry bags), and it is occasionally recycled. Its downside is that it is highly flammable. Polypropylene possesses low density, high stiffness, heat resistance, chemical inertness, steam barrier qualities, good transparency, impact/rigidity balance, stretchability, and weldability. Stock Availability of Polypropylene: Polypropylene materials are available in Polypropylene Round, Polypropylene Sheet. We supply these materials as per customer’s cutting requirement. Applications of Polypropylene: Polypropylene is used in Extrusion coating, Blow molding Injection, Injection molding, and thermoforming. It is the most common plastic used in most of the industries for its chemical resistance. It is used to create medical products such as syringes, specimen bottles, etc..

Send Message
product image
Plastic and Laminates

Polyurethane is a polymeric material that comes in a variety of shapes. It can be designed to be stiff or flexible, and it is the material of choice for a wide range of end-user applications, including refrigerator and freezer insulation. Polyurethane offers good electrical qualities, food flexibility, abrasion and impact resistance, rip resistance, and resistance to oil, water, and grease. Stock Availability of Polyurethane: Polyurethane material is available in the forms of Polyurethane round, Polyurethane sheet. Applications of Polyurethane: Polyurethanes are used for car seats comfort, bumpers and it is also used for moldings which include door frames, columns, balusters, window headers, pediments, medallions and rosettes.

Send Message

Still searching for
impact project delays?